CUC has been appointed as the marine contractor for the installation of Marine pipelines from installation to commissioning for a Desalination plant located in Qurrayyat, Oman. The scope of CUC’s work Includes:
- Design of Intake and Outfall Pipeline.
- HDPE welding and testing of 3800 metres of 2400mm OD for the intake pipeline and 3800 Metres of 1800mm OD pipe for the outfall pipeline.
- Supply and installation of concrete ballast blocks.
- Offshore and onshore dredging and backfilling the pipeline trench.
- Supply and installation of sheet piling.
- Installation of offshore and onshore HDPE pipeline.
- Bathymetric survey and Videographic survey.
- Supply and Installation of two 15 metre high, 5000mm diameter Intake Structures.
- Supply of Installation of outfall diffuser system.
- Supply and installation of Intake navigational system.
- Dewatering.
- Testing and commissioning of the intake and outfall pipeline.