Intake and Outfall line at Barka Desalination Plant

Consolidated Union Contracting (CUC) has been appointed as the marine contractor for the Barka Desalination plant project. CUC’s scope is the design, procurement and construction of 2 subsea 2200mm Diameter HDPE Intake pipeline each of 1525 mtr long and  2 x 1400mm Dia HDPE brine outfall pipes of 812 mtr long and associated works including the subsea installation of inlet chamber and connection to existing land based structures.