CUC completed the supply, installation, testing and commissioning of an Intake and Outfall Line for the Al Ghubrah Desalination Plant. The Scope of the project included:
- Supply, install, test and commission 4.5kms of 2200mm and 1800mm diameter HDPE intake and outfall pipes.
- Offshore dredging works.
- HDPE Welding utilizing our 2200mm butt fusion welding machine.
- Hydrostatic testing.
- Diving operations to aid with installation and surveying.
- Supply and installation of Passive Intake screens, Diffuser’s and Scourer Protection.