Products


Recent Updates

  • Launch of New Catalogue
  • Towing of the 2200mm dia solid wall HDPE spool section into installation position at Barka IWP in Oman
  • Installation of 3800 meters of 2400mm diameter HDPE intake line and 3800 meters of 1800mm diameter HDPE outfall line at Qurayyat desalination plant Oman .
  • Launching ramp for installation of concrete collars
  • Pipeline sinking at Qurayyat desalination plant Oman .
  • Underwater flange connection of 2200mm Diameter HDPE pipeline
  • Connecting Lifting bags for shallow water heavy lift .
  • Lifting of Concrete intake tower section . Ready to installation offshore
  • Intake Pipeline Sinking into the pre-dredged trench
  • Backfilling of Pipe trench to complete land based phase .

Recent Projects

  • Intake and Outfall line at Barka Desalination Plant
  • Intake and Outfall line at Quriyat Desalination Plant

Follow Us Facebook

Consoliated union construction

Follow Us On Google +